1. All Stories
  2. Politics
  3. Economy
  4. World
  5. Nuclear
  6. Society/Culture
  7. Space/Science
  8. Sports
  9. Tourism
  10. Other Media
  11. Videos
  12. Photos
  13. Cartoons
  14. Interview
    • فارسی
    • عربی
    • Türkçe
    • עברית
    • Pусский
  • RSS
  • Telegram
  • Instagram
  • Twitter
  • Facebook
  • All Stories
  • Politics
  • Economy
  • World
  • Nuclear
  • Society/Culture
  • Space/Science
  • Sports
  • Tourism
  • Other Media
  • Videos
  • Photos
  • Cartoons
  • Interview

Iran’s Manjil-Rudbar Freeway to Be Launched Today

  • March, 11, 2024 - 11:47
  • Economy news
Iran’s Manjil-Rudbar Freeway to Be Launched Today

TEHRAN (Tasnim) – The 8.2 km Manjil-Rudbar Freeway as part of the 138 km Qazvin-Rasht Freeway will be inaugurated on Monday with the participation of Iran’s Vice President for Executive Affairs Mohsen Mansouri and Minister of Roads and Urban Development Mehrdad Bazrpash.

Economy

After the Shiraz-Isfahan Freeway as the longest freeway project and also the Tehran-Shomal Freeway as the most difficult freeway project in Iran, the Manjil-Rudbar Freeway is the third promised project of the current administration for construction of freeways in the country.

The operation of Manjil-Rudbar Freeway will remove the traffic bottlenecks between Tehran and Gilan Province and there will be a reduction in travel time, fuel consumption and car depreciation along the route.

According to Iran Deputy Minister of Roads and CEO of the Construction and Development of Transportation Infrastructures Company Kheirollah Khademi, this freeway project had many bridges and tunnels due to the location in the mountainous area.

The technical construction of this project consisted of six large bridges with a total length of 1,576 meters, 314 concrete piles and four tunnels with a total length of 2,876 meters, he added, the website of the Ministry of Roads and Urban Development reported.

 
R1651/P
Read more
Tehran-Shomal Freeway Symbol of Self-Confidence, Wisdom of Iranian Nation: President
Completing Construction Operation of North-South Corridor A Top Priority: Official
IRGC Construction Base Could Replace Koreans in Freeway Project
tasnim
tasnim
tasnim
  • About
  • Contact Us
  • Most Visited
  • Archive
Follow Us:
  • RSS
  • Telegram
  • Instagram
  • Twitter
  • Facebook

All Content by Tasnim News Agency is licensed under a Creative Commons Attribution 4.0 International License.